Yangdong Co. Y90 Series Manuel de service Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 51
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
OPERATION&MAINTENANCE MANUAL
required.
As for a new one, sinking distance between the plane of the air inlet and air outlet
and the plane of the cylinder head is 0.7-0.9mm, as figure 5 indicated. After amendment
to it for many times, the sinking distance may be increased. When it exceeds 2mm, it’s
recommended to change the valve seat.
The valve clearance shall be checked regularly. See Section 1 of chapter V for detail
on adjustment methods. If the valve clearance is excessive, it may affect correctness of
gas distribution and timing and increase noise of the valve structure; insufficient
clearance may lead to incomplete closing and burning of the air valve.
2cylinder block
Fig.6 protruding height of the liner flange
plane relative to the plane of cylinder
block
The cylinder body is made of cast iron HT250 and portal shape structure is adopted.
Besides the installation hole, bolt hole for cylinder head on the top of the cylinder body,
the water hole to the cylinder head, and lubricant hole at the back of the cylinder body to
the cylinder head are on it.
Water pump and engine oil pump are installed at upper part and lower part of
front-end of the cylinder body. Fly wheel casing is installed at back-end of the cylinder
body. The lubricant inlet and bolt hole for installing crankcase oil tray are located at the
bottom of the cylinder body. When dismantling the diesel for repair, each oil channel shall
be repaired to ensure clean and unblocking. Bulkhead of each channel shall be sealed
and oil leakage is not allowed.
The main bearing is of fully-supported suspending type. Matching brazing is
employed for main bearing casing and the cylinder body. Matching marks are marked on
the cylinder body and main bearing casing. Any exchange or reverse assembling is not
allowed. The main shaft bushing is the shafting bushing of high tin broze zergarl. When
28
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 50 51

Commentaires sur ces manuels

Pas de commentaire